Calpe completes stormwater collector works in Borumbot to reduce flood risk
Aigües de Calp has completed works on the stormwater collector in the Borumbot area, reducing the risk of flooding during heavy rainfall.
Aigües de Calp has completed works on the stormwater collector in the Borumbot area, an infrastructure designed to minimise the risk of flooding in this zone during episodes of heavy rainfall.
The works form part of improvements to the municipal drainage system, aimed at protecting both residents and properties from adverse weather events.
This intervention responds to the need to reinforce the water evacuation network in vulnerable areas, guaranteeing greater safety for the local community.
Local authorities emphasise the importance of these preventive works to adapt infrastructure to current climate patterns and future episodes of torrential rain.
Source: informacion.es
Related news
- GeneralAigües d'Elx launches plan for San Antón ravine with €33 million investment
The joint-venture company will allocate €33 million by 2030 for sanitation works and a masterplan to prevent flooding on the Santa Pola road using wetlands.
- GeneralTSJCV acquits former Torrevieja councillor Carmen Gómez over cleaning emergency plan
The High Court of Justice overturns the administrative malfeasance conviction against former PP councillor Carmen Gómez Candel related to the cleaning emergency plan.